CSST Production Line Steps

Step One: Forming Shop

Forming Shop use 304 stainless steel to make the semi-finished products

Step Two: Stretching&Cutting

Stretching and cutting process

Step Three: Roll Leveling

Roll leveling for the CSST semi-finished.

Step Four: Burring

Burring process to get smooth semi-products.

Step Five: Annealing Bright

Important step of Annealing, this step get the perfect products of tube.

Step Six: Nut Assembly

Nut assembly process make the CSST final products.

Step Seven: Leak Testing

For every connect product, we must do the leak testing process to make sure property sealability

Step Eight: Factory Inspection

Before package we will inspect every tube to make sure the every process work right.

Step Nine: Package

5 PCS/PP BAG, 25 PCS/CARTON

APPLICATION

Free HTML5 Bootstrap Template by

GAS WATER HEATER

Leading Manufacturer of CSST for indoor or outdoor application, can be used For Gas Water Heater.

Free HTML5 Bootstrap Template by

INTEGRATED STOVE

Leading Manufacturer of CSST for indoor or outdoor application, applied in Integrated Stove Heating.

Free HTML5 Bootstrap Template by

GAS GRILL

Leading Manufacturer of CSST for indoor or outdoor application, often used in Gas Grill Area.